Shortening through additional resources

Concept · 2 of 10 frameworks name this concept

The schedule compression technique in which activities on the critical path are sped up through more staff, overtime or equipment, usually at extra cost.

ConceptShortening through additional resourcesTopic area Scheduling
Preferred term
cross-frameworkCrashing
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Crashing
Concordance of the concept “Shortening through additional resources”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 2 without counterpart · 6 not yet reviewed
  • PMI / PMBOK
    Crashingequivalent
  • general
    CrashingPreferred term
  • Scrum
    no designation
  • Kanban
    no designation
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed