Identifier of work breakdown structure elements

Concept · 2 of 10 frameworks name this concept

The unique, usually hierarchical number that identifies each element of the work breakdown structure and links it in cost and schedule planning.

ConceptIdentifier of work breakdown structure elementsTopic area Planning and project structure
Preferred term
cross-frameworkWBS codealso WBS number · WBS identifier
closely related
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Code of accountsdenotes the entire numbering system, the WBS code the individual identifier
Concordance of the concept “Identifier of work breakdown structure elements”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 8 not yet reviewed
  • PMI / PMBOK
    Code of accountsclosely related
  • general
    WBS codePreferred term
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed