Estimating from comparable initiatives

Concept · 2 of 10 frameworks name this concept

The estimating technique that derives effort, duration or cost from the actual values of similar past initiatives; fast, but only as good as the comparison.

ConceptEstimating from comparable initiativesTopic area Resources and estimating
Preferred term
cross-frameworkAnalogous estimatingalso Analogy-based estimating · Top-down estimating
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Analogous estimating
Concordance of the concept “Estimating from comparable initiatives”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 8 not yet reviewed
  • PMI / PMBOK
  • general
    Analogous estimatingPreferred term
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed