Adjusting the schedule to available capacity

Concept · 2 of 10 frameworks name this concept

The shifting or stretching of activities so that no resource is scheduled beyond its available capacity, if necessary with a later project end.

ConceptAdjusting the schedule to available capacityTopic area Resources and estimating
Preferred term
cross-frameworkResource levelling
closely related
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Resource levelingallows the finish date to move; resource balancing also includes smoothing within float
Concordance of the concept “Adjusting the schedule to available capacity”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 8 not yet reviewed
  • PMI / PMBOK
    Resource levelingclosely related
  • general
    Resource levellingPreferred term
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed