Product Description or Work package description?

partially overlapping

Like a WBS dictionary, a work package description records scope and responsibility. It covers a single work package, not every element of the structure.

Comparison of Product Description and Work package description
PRINCE2Product Descriptioncross-frameworkWork package description
What it coversPRINCE2 management product describing the purpose, composition, quality criteria and checking methods of a single product.Document that bindingly records the content, results, responsible person, dates, effort and interfaces of a work package
Equivalent in ISO 21506Work breakdown structure dictionary partially overlappingWork breakdown structure dictionary partially overlapping
To the term pageProduct DescriptionWork package description

All designations of this concept side by side