Iteration or Sprint?
closely related
Like any iteration, a Sprint is a time-boxed work cycle ending in a verifiable result. In Scrum it lasts at most one month and has a Sprint Goal and set events.
| cross-frameworkIteration | ScrumSprint | |
|---|---|---|
| What it covers | Repeated, time-limited work cycle that ends with an intermediate result that can be reviewed | Fixed-length period of one month or less in which a Scrum Team works towards a Sprint Goal and which contains all other events |
| Equivalent in PMI / PMBOK Guide | Iteration equivalent | Iteration closely related |
| To the term page | Iteration | Sprint |