Progressively refined planning

Concept · 2 of 9 frameworks name this concept

The planning approach in which near-term stages are planned in detail and later ones only roughly; the plan is continually refined as knowledge grows.

ConceptProgressively refined planningTopic area Planning and project structure
Preferred term
ISO 21506 · 3.82Rolling wave planning
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Rolling wave planning
Concordance of the concept “Progressively refined planning”. The preferred term is the designation under which the glossary lists the concept.