Leading role of the delivering side

Concept · 2 of 9 frameworks name this concept

The role on the steering body that speaks for the side designing and producing the results and is answerable for its resources and technical solution.

ConceptLeading role of the delivering sideTopic area Project organization
Preferred term
PM² · Abschnitt 4.6Solution Provideralso SP
closely related
PRINCE2 · Praktik OrganisationSenior SupplierMay represent several internal and external suppliers; the project manager is appointed by the Executive, not by the Senior Supplier.
Concordance of the concept “Leading role of the delivering side”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 7 not yet reviewed
  • PRINCE2
    Senior Supplierclosely related
  • PM²
    Solution ProviderPreferred term · Abschnitt 4.6
  • ISO 21506
    not yet reviewed
  • PMI / PMBOK
    not yet reviewed
  • IPMA
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed