Independent assurance of a project for its directing level

Concept · 2 of 9 frameworks name this concept

The planned review, independent of the project manager, that gives the sponsor or steering body a reliable view of whether the project is on course.

ConceptIndependent assurance of a project for its directing levelTopic area Project organization
Preferred term
ISO 21506 · 3.62Project assurance
closely related
PRINCE2 · Praktik OrganisationProject Assurance (PRINCE2)In PRINCE2 split into business, user and supplier perspectives and a responsibility of the board members.
Concordance of the concept “Independent assurance of a project for its directing level”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 7 not yet reviewed
  • ISO 21506
    Project assurancePreferred term · 3.62
  • PRINCE2
  • PMI / PMBOK
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed