Formal authorization of a project

Concept · 6 of 10 frameworks name this concept

The act and the document by which a project is formally put into effect: purpose and scope are set and the project manager is granted their authority.

All frameworks at a glance

7 designations · 2 without counterpart · 2 not yet reviewed
  • ISO 21506
    Project mandatePreferred term · 3.12
  • PMI / PMBOK
    Project charterequivalent
  • PRINCE2
    Project Briefpartially overlappingPreliminary form: basis for the decision on initiation; the project itself is authorized with the project initiation documentation.
    Project Mandatefalse friendIn ISO 21506 “project mandate” is the binding authorization of a project; in PRINCE2 the project mandate is only the external trigger that starts preparation.
  • PM²
    Project Charterclosely relatedforms the basis for approval together with the business case; the project manager has already been appointed
  • Six Sigma
    Six Sigma project charterclosely relatedTailored to an improvement project with a measurable output, usually shorter and still updated during the first phases.
  • general
    Project outlinepartially overlappingno entry yetpreliminary form, usually without formal approval
  • Scrum
    no designationScrum does not define a formal authorization of a project
  • Kanban
    no designation
  • IPMA
    not yet reviewed
  • Lean
    not yet reviewed