Estimating using statistical parameters

Concept · 2 of 10 frameworks name this concept

The estimating technique that calculates effort or cost from an established relationship, such as cost per square metre or hours per function.

ConceptEstimating using statistical parametersTopic area Resources and estimating
Preferred term
cross-frameworkParametric estimating
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Parametric estimating
Concordance of the concept “Estimating using statistical parameters”. The preferred term is the designation under which the glossary lists the concept.