Assessment of whether an initiative is feasible

Concept · 2 of 10 frameworks name this concept

The pre-project study of whether an initiative is technically, economically, legally and organizationally feasible, usually with options and a recommendation.

ConceptAssessment of whether an initiative is feasibleTopic area Initiating
Preferred term
cross-frameworkFeasibility study
closely related
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Feasibility analysisdenotes the analysis in general, the feasibility study its documented result
Concordance of the concept “Assessment of whether an initiative is feasible”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 8 not yet reviewed
  • PMI / PMBOK
    Feasibility analysisclosely related
  • general
    Feasibility studyPreferred term
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed