Deliverable or Increment?
partially overlapping
Like a deliverable, an Increment is a verifiable result. In Scrum it is a usable step toward the Product Goal that includes all earlier Increments.
| PMI / PMBOK GuideDeliverable | ScrumIncrement | |
|---|---|---|
| What it covers | Verifiable result, such as a product, a document or a capability, without which the process, phase or project concerned cannot be closed. | Concrete, usable step towards the Product Goal that adds to all previous results and meets the criteria of the Definition of Done |
| Equivalent in ISO 21506 | Deliverable equivalent | Deliverable partially overlapping |
| To the term page | Deliverable | Increment |