Team carrying out the project work

Concept · 3 of 10 frameworks name this concept

The group of people who jointly carry out the work of a project and collaborate for this purpose under the direction of an accountable function.

ConceptTeam carrying out the project workTopic area Project organization
Preferred term
cross-frameworkProject teamalso Project group
closely related
PM² · Abschnitt 4.10Project Core Teamprovider side only; the requesting organization's team does not belong to it
partially overlapping
Scrum · Abschnitt Scrum TeamScrum Teamincludes the Product Owner and Scrum Master and is oriented to a product and its Product Goal, not to a time-limited project
Concordance of the concept “Team carrying out the project work”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

3 designations · 7 not yet reviewed
  • PM²
    Project Core Teamclosely related
  • Scrum
    Scrum Teampartially overlapping
  • general
    Project teamPreferred term
  • ISO 21506
    not yet reviewed
  • PMI / PMBOK
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed