Roles, bodies and authority in a project

Concept · 2 of 10 frameworks name this concept

The temporary structure defining who holds which role in the project, which bodies exist, who decides what and through which lines reporting takes place.

ConceptRoles, bodies and authority in a projectTopic area Project organization
Preferred term
cross-frameworkProject organization
closely related
PRINCE2 · Praktik OrganisationOrganizing practiceFixed role model with project board, project manager and team managers, tailored to the project.
Concordance of the concept “Roles, bodies and authority in a project”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 8 not yet reviewed
  • PRINCE2
    Organizing practiceclosely related
  • general
    Project organizationPreferred term
  • ISO 21506
    not yet reviewed
  • PMI / PMBOK
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed