Representation of user interests in a project

Concept · 2 of 9 frameworks name this concept

The role, often on the steering body, that brings the needs and interests of future users into the project and assesses the results from their perspective.

ConceptRepresentation of user interests in a projectTopic area Project organization
Preferred term
PM² · Abschnitt 4.9User Representativesalso URs
closely related
PRINCE2 · Praktik OrganisationSenior UserMember of the Project Board with leadership responsibility, also answerable for demonstrating benefits.
Concordance of the concept “Representation of user interests in a project”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 7 not yet reviewed
  • PRINCE2
    Senior Userclosely related
  • PM²
    User RepresentativesPreferred term · Abschnitt 4.9
  • ISO 21506
    not yet reviewed
  • PMI / PMBOK
    not yet reviewed
  • IPMA
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed