Positive effect of an initiative for stakeholders

Concept · 2 of 9 frameworks name this concept

The measurable advantage that the results of a project, programme or portfolio bring to the organization or other stakeholders, often only after project end.

ConceptPositive effect of an initiative for stakeholdersTopic area Portfolios and programmes
Preferred term
ISO 21506 · 3.6Benefit
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Benefits
Concordance of the concept “Positive effect of an initiative for stakeholders”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 7 not yet reviewed
  • ISO 21506
    BenefitPreferred term · 3.6
  • PMI / PMBOK
    Benefitsequivalent
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed