Organization structure with dual reporting

Concept · 2 of 10 frameworks name this concept

The organization structure in which employees are assigned both to their functional department and to a project; the project manager's authority varies by type.

ConceptOrganization structure with dual reportingTopic area Project organization
Preferred term
cross-frameworkMatrix organizationalso Matrix structure
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Matrix organization
Concordance of the concept “Organization structure with dual reporting”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 2 without counterpart · 6 not yet reviewed
  • PMI / PMBOK
  • general
    Matrix organizationPreferred term
  • Scrum
    no designation
  • Kanban
    no designation
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed