Leading and controlling projects

Concept · 2 of 9 frameworks name this concept

The planning, organizing, controlling and closing of projects using knowledge, methods and tools so that objectives are achieved within the given constraints.

ConceptLeading and controlling projectsTopic area Fundamentals
Preferred term
ISO 21506 · 3.65Project management
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Project management
Concordance of the concept “Leading and controlling projects”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 7 not yet reviewed
  • ISO 21506
    Project managementPreferred term · 3.65
  • PMI / PMBOK
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed