Hierarchical breakdown of the project organization

Concept · 2 of 9 frameworks name this concept

The tree-like representation of the organizational units involved in a project, often linked to the work packages for which they are responsible.

ConceptHierarchical breakdown of the project organizationTopic area Project organization
Preferred term
ISO 21506 · 3.40Organizational breakdown structurealso OBS
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Organizational breakdown structure
Concordance of the concept “Hierarchical breakdown of the project organization”. The preferred term is the designation under which the glossary lists the concept.