Cost of Poor Quality or Cost of quality?

partially overlapping

In Six Sigma, cost of poor quality captures defect costs, like cost of quality. It covers only failure costs, including hidden ones, but not prevention.

Comparison of Cost of Poor Quality and Cost of quality
Six SigmaCost of Poor QualityPMI / PMBOK GuideCost of quality
What it coversCosts incurred because a process produces defects or fails to meet requirements, including follow-on costs that are hard to see.Sum of the expenses for preventing defects, for inspection and for the consequences of failures over the whole life of a product.
Equivalent in cross-frameworkCost of quality partially overlappingCost of quality equivalent
To the term pageCost of Poor QualityCost of quality

All designations of this concept side by side