Timebox or Timeboxing?
closely related
Like timeboxing, a Timebox belongs to working in fixed time frames. The term denotes the fixed period itself, whereas timeboxing is the way of working with it.
| PMI / PMBOK GuideTimebox | cross-frameworkTimeboxing | |
|---|---|---|
| What it covers | Period of time fixed in advance for a piece of work and never extended; if needed, the scope is adjusted instead. | Way of working in which a task or meeting is given a fixed time frame that is not exceeded |
| To the term page | Timebox | Timeboxing |