# Verification

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Concept: [Evidence that requirements are met](https://pmdecoder.com/en/concept/evidence-that-requirements-are-met/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/verification/

## Definition

Verification checks whether something has been built or produced as described. The basis is specifications, drawings or requirements documents; the means are tests, measurements, inspections, calculations or reviews. In simple terms, the question is: did we build the product right? The result is documented so that the fulfilment of each requirement can be traced.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Verification](https://pmdecoder.com/en/glossary/verification-pmi/) | equivalent | — |

## Distinction

Validation asks whether the result is fit for its actual purpose, that is, whether the right product was built. A result can be verified and still fail validation if the requirements did not describe the need correctly. Acceptance is the contractual declaration, which often builds on verification and validation.

## In practice

For a new access control system in a data centre, the requirements specification lists 60 requirements, such as an opening time of less than one second and the logging of every entry. Verification assigns a test to each requirement, carries it out and enters the result in an evidence list. Two requirements are not met because logging loses entries during a power failure. The manufacturer makes corrections, and the test is repeated.

## Frequently asked questions

### How is the fulfilment of a requirement demonstrated?

By test, inspection, analysis or demonstration. Which method applies should already be settled when the requirement is written.

### Who carries out verification?

Often the contractor itself, supplemented for critical requirements by independent inspectors or the client.

## Related terms

- [Validation](https://pmdecoder.com/en/glossary/validation/)
- [Requirement](https://pmdecoder.com/en/glossary/requirement/)
- [Formal acceptance](https://pmdecoder.com/en/glossary/formal-acceptance/)
- [Design review](https://pmdecoder.com/en/glossary/design-review/)

---