# Value analysis

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Cost and economic viability](https://pmdecoder.com/en/area/cost-and-economic-viability/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/value-analysis/

## Definition

Value analysis does not first ask what something costs but what function it is meant to fulfil. In cross-functional teams, the functions of a product, building or process are described and assessed, and alternative solutions are sought that fulfil the same function more cheaply, more simply or better. The method originated in the USA in the 1940s; in Europe, the standard EN 12973 describes value management.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Other terms

- Value engineering (related, not equivalent)
- Value management (related, not equivalent)

## Distinction

Pure cost cutting removes features, whereas value analysis looks for cheaper ways to achieve the required functions. Value engineering refers to its use in development and design before a product exists; value analysis in the narrower sense also covers the revision of existing products. Cost-benefit analysis compares finished alternatives; value analysis first generates them.

## In practice

During the design of a sports hall, the cost calculation is twelve per cent over budget. Instead of cutting fittings across the board, the design team holds a value analysis workshop. For the function “bring daylight into the hall”, three solutions are compared; a band of windows in the facade achieves almost the same as expensive roof lights and also reduces maintenance costs. Overall, the team finds savings of nine per cent without restricting use.

## Frequently asked questions

### When is value analysis used in a project?

It is most effective in early planning phases, because changes cost little there. It is still possible later, but the scope for change is smaller.

### Who takes part in a value analysis?

A cross-functional team from design, construction or delivery, users, purchasing and operations, led by a facilitator trained in the method.

## Related terms

- [Cost management](https://pmdecoder.com/en/glossary/cost-management/)
- [Requirement](https://pmdecoder.com/en/glossary/requirement/)
- [Product life cycle](https://pmdecoder.com/en/glossary/product-life-cycle/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
