# Validation

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Concept: [Evidence of fitness for purpose](https://pmdecoder.com/en/concept/evidence-of-fitness-for-purpose/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/validation/

## Definition

Validation checks whether a product, system or process actually does what it is intended for. It takes place under conditions as realistic as possible, often with real users, data and environments. In simple terms, the question is: did we build the right product? In regulated industries such as medical technology, pharmaceuticals or aviation, it is required by law or standards and documented rigorously.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Validation](https://pmdecoder.com/en/glossary/validation-pmi/) | equivalent | — |

## Distinction

Verification checks against specified requirements, validation against the actual purpose. A pilot operation or a user test is a common form of validation. Acceptance is a contractual declaration, validation a technical check; the two can coincide, but they do not have to.

## In practice

A hospital introduces a new documentation system for its intensive care unit. All specified functions have been verified. During validation, nurses work in parallel with the new system for a week in real shifts. It turns out that entering vital signs every hour requires too many clicks and is not done promptly in stressful situations. Although all requirements were met, the input screen is revised before roll-out.

## Frequently asked questions

### Why is verification not enough?

Because requirements can be incomplete or ambiguous. Only use under real conditions shows whether the result serves its purpose.

### When should validation take place?

As early as possible with prototypes or pilot applications, and finally before broad roll-out, so that findings can still be acted on.

## Related terms

- [Verification](https://pmdecoder.com/en/glossary/verification/)
- [Formal acceptance](https://pmdecoder.com/en/glossary/formal-acceptance/)
- [Customer](https://pmdecoder.com/en/glossary/customer/)
- [Design review](https://pmdecoder.com/en/glossary/design-review/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.