# V-model

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Approaches and agility](https://pmdecoder.com/en/area/approaches-and-agility/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/v-model/

## Definition

In the V-model, the levels on the left-hand side lead downwards from the overall need via system design to individual components, and the levels on the right-hand side lead back up from component testing via integration to acceptance. Each test level tests against the specifications of the opposite design level. In Germany, the V-Modell XT is widely used as the standard for IT projects in public administration.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Classification

- Broader term: [Process model](https://pmdecoder.com/en/glossary/process-model/)

## Distinction

The waterfall model only arranges phases in sequence, whereas the V-model explicitly links design and testing. Verification checks against requirements, validation against the intended purpose; in the V-model both take place on the various levels. The V-Modell XT is an extended, tailorable version with roles, products and decision points.

## In practice

A supplier develops a control unit for commercial vehicles. The vehicle manufacturer's requirements give rise to system requirements, and these in turn to the hardware and software design. For each level, the team already decides during design how testing will be done later: module tests for the software, integration tests on the test bench, system tests in the vehicle. This way, test cases are ready when implementation is complete.

## Frequently asked questions

### Where is the V-model used?

Mainly in the development of safety-critical systems, for example in the automotive industry, medical technology and rail, and in IT projects of the public sector.

### Is the V-model rigid?

In its basic form, yes. More recent versions allow tailoring and incremental working within the levels.

## Related terms

- [Waterfall model](https://pmdecoder.com/en/glossary/waterfall-model/)
- [Verification](https://pmdecoder.com/en/glossary/verification/)
- [Validation](https://pmdecoder.com/en/glossary/validation/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.