# Toyota Production System

- Framework: [Lean](https://pmdecoder.com/en/framework/lean/)
- Canonical version: https://pmdecoder.com/en/glossary/toyota-production-system/

## Definition

The Toyota Production System evolved over decades and was decisively shaped by Taiichi Ohno. Its starting point was the situation of a small manufacturer that had to produce many variants in small quantities with little capital. The system is often depicted as a house: the roof consists of goals such as high quality, low cost and short delivery times, the two pillars are just-in-time and autonomation, and the foundation is formed by levelled production, standardized work and kaizen. The involvement of all employees in solving problems carries the whole. Western researchers later described the system under the name lean production.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Classification

- Narrower terms: [Production levelling](https://pmdecoder.com/en/glossary/production-levelling/), [Autonomation](https://pmdecoder.com/en/glossary/autonomation/), [Just-in-time](https://pmdecoder.com/en/glossary/just-in-time/)

## Distinction

Lean is the generalized version of the ideas of the Toyota Production System, transferred to other industries and to administration. The Toyota Production System itself is the concrete system of one company. Many companies have built their own production systems on this model. Six Sigma has a different origin and relies more heavily on statistical methods; Lean Six Sigma combines both approaches.

## In practice

A mechanical engineering company does not want to introduce its Lean programme as a collection of individual tools. Management takes the house of the Toyota Production System as its guide and lays the foundation first: it describes standards for the most frequent operations and sets up improvement rounds. Only then do pull control in assembly and signals for stopping at defects follow.

## Frequently asked questions

### Is the Toyota Production System the same as Lean?

Not quite. Lean is the generalized description that emerged from the study of the Toyota Production System. The Toyota Production System is the original in one particular company.

### Why can the system not simply be copied?

Because it rests less on tools than on a leadership culture that has grown over a long time. Those who adopt only the tools without fostering problem solving and involvement usually achieve only partial success.

## Related terms

- [Just-in-time](https://pmdecoder.com/en/glossary/just-in-time/)
- [Autonomation](https://pmdecoder.com/en/glossary/autonomation/)
- [Production levelling](https://pmdecoder.com/en/glossary/production-levelling/)
- [Kaizen](https://pmdecoder.com/en/glossary/kaizen/)
- [Muda](https://pmdecoder.com/en/glossary/muda/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
