# Total cost of ownership

abbr. TCO

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Concept: [Total costs over the service life](https://pmdecoder.com/en/concept/total-costs-over-the-service-life/)
- Topic area: [Cost and economic viability](https://pmdecoder.com/en/area/cost-and-economic-viability/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/total-cost-of-ownership/

## Definition

Total cost of ownership covers not only the purchase price but all costs associated with an asset over its use: implementation, operation, energy, maintenance, licences, training, downtime and decommissioning. This makes it possible to compare offers that differ in purchase price and follow-up costs. The concept became known in the 1980s in the field of information technology and is used in many industries today.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Total cost of ownership](https://pmdecoder.com/en/glossary/total-cost-of-ownership-pmi/) | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |

## Distinction

Life cycle costs usually consider the entire product from the perspective of the manufacturer or operator, TCO the costs from the perspective of the owner or user; in everyday use, the two terms are often used interchangeably. The purchase price is only one component. ROI relates costs to benefits, whereas TCO considers only the cost side.

## In practice

A city administration is procuring 500 desktop computers. The cheapest offer is 60 euros per device below the second. However, the TCO calculation over five years also takes into account power consumption, warranty extension and the IT department's maintenance effort. Over the useful life, the second offer is around 40 euros per device cheaper, because the devices are more energy-efficient and come with a longer manufacturer's warranty.

## Frequently asked questions

### Which costs are often forgotten?

Implementation and training effort, internal support, downtime, adjustments when updates are installed, and the costs of replacement and disposal.

### Over what period is TCO calculated?

Over the expected useful life, usually three to six years for IT and considerably longer for plant and buildings.

## Related terms

- [Product life cycle](https://pmdecoder.com/en/glossary/product-life-cycle/)
- [Return on investment](https://pmdecoder.com/en/glossary/return-on-investment/)
- [Supplier selection](https://pmdecoder.com/en/glossary/supplier-selection/)

---