# Technical performance

- Framework: [ISO 21506](https://pmdecoder.com/en/framework/iso-21506/)
- Reference: ISO 21506:2024, 3.89
- Edition: ISO 21506:2024
- Topic area: [Monitoring and control](https://pmdecoder.com/en/area/monitoring-and-control/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/technical-performance/

## Definition

Cost and schedule show how much effort a project has put in so far, but not whether the result technically does what it is supposed to do. Technical performance closes this gap. It is measured by characteristics such as range, weight, throughput, response time or the number of requirements met, which are compared with target values and a planned profile. Because many capabilities develop step by step, it is often tracked in stages over the life of a project or programme.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

Earned value measures progress on the planned work in budget terms, technical performance the state the result has reached. A project can finish all its work packages on time and still deliver a product that is too heavy or too slow. Quality control checks individual results against requirements, while technical performance follows how important characteristics develop over time.

## In practice

A manufacturer is developing a cargo drone with a required payload of 25 kilograms. After each development step, the payload achieved is compared with a planned profile: 15 kilograms after the first prototype, 20 after the second. The second prototype manages only 17 kilograms, although budget and schedule are on track. The project manager has the frame structure redesigned to be lighter before the production tooling is ordered.

## Frequently asked questions

### Which characteristics are suitable for measurement?

Those that are decisive for the benefit, can be measured objectively and would be costly to miss, such as weight, power, energy consumption or availability. A few well-chosen characteristics are usually enough.

### How are technical performance and earned value related?

They can be linked by crediting progress only when agreed technical interim targets have been reached. A work package then does not count as complete while the result still falls short of the required values.

## Related terms

- [Earned value](https://pmdecoder.com/en/glossary/earned-value-iso/)
- [Quality control](https://pmdecoder.com/en/glossary/quality-control/)
- [Deliverable](https://pmdecoder.com/en/glossary/deliverable/)
- [Requirement](https://pmdecoder.com/en/glossary/requirement/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
