# Sprint Goal

- Framework: [Scrum](https://pmdecoder.com/en/framework/scrum/)
- Reference: Scrum Guide 2020, Abschnitt Commitment: Sprint-Ziel
- Edition: Scrum Guide 2020
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/sprint-goal/

## Definition

The Sprint Goal states what a Sprint is for. The Scrum Team formulates it jointly in Sprint Planning, after which it becomes part of the Sprint Backlog. As the Developers' commitment, it concentrates the work of the Sprint on a shared purpose so that the team works together instead of on separate topics. At the same time, it leaves room for manoeuvre: which items and tasks are needed exactly may change along the way. Should the work develop differently than anticipated, the Developers negotiate the scope with the Product Owner without giving up the Sprint Goal itself. If it becomes obsolete, the Product Owner can cancel the Sprint.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

The Product Goal is long-term; the Sprint Goal applies to only one Sprint and contributes to the Product Goal. A list of selected items is not yet a Sprint Goal: the goal describes the purpose, while the items are one possible way of getting there. It differs from a milestone in that it is not a checkpoint but gives direction to ongoing work.

## In practice

The team at an energy supplier is planning a Sprint for the customer portal. Instead of "Implement tickets 412 to 418", it formulates the Sprint Goal "Customers can submit their meter reading without logging in". When it turns out that the planned photo recognition of the meter number will not be ready in time, the team drops it after consulting the Product Owner. Submission via an input field still meets the goal.

## Frequently asked questions

### What happens if the Sprint Goal is not achieved?

The Sprint still ends at the planned time. In the Sprint Review and the Retrospective, the team discusses why the goal was missed and what it learns from this.

### Can a Sprint have several Sprint Goals?

No. The Scrum Guide provides for exactly one Sprint Goal. It can, however, cover several items that contribute to it together.

## Related terms

- [Sprint Backlog](https://pmdecoder.com/en/glossary/sprint-backlog/)
- [Product Goal](https://pmdecoder.com/en/glossary/product-goal/)
- [Sprint Planning](https://pmdecoder.com/en/glossary/sprint-planning/)
- [Milestone](https://pmdecoder.com/en/glossary/milestone/)

## Differences from other editions

- Scrum Guide 2017: The Sprint Goal was likewise set in Sprint Planning and explained to the Development Team the purpose of the Increment it was building. It was not yet assigned to an artifact as a commitment and stood alongside the Sprint Backlog rather than within it.

---