# Specification limit

also: Tolerance limit

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/specification-limit/

## Definition

Specification limits define which values of a characteristic are acceptable, for example a shaft diameter of 20 millimetres with a permitted deviation of 0.05 millimetres up and down. They come from design, contract, standard or customer request and say nothing about how a process actually performs. Values outside the limits are considered defects.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

Control limits on the control chart describe the natural variation of a process, specification limits the requirements for the result. A process is considered capable if its variation lies well within the specification limits; indices such as Cp and Cpk express this relationship. The tolerance is the distance between the upper and lower specification limits.

## In practice

A supplier is to deliver plastic housings with a wall thickness of 2.0 millimetres and a tolerance of 0.1 millimetres in either direction. The control chart shows a stable process, but one that varies between 1.88 and 2.12 millimetres. Although there is no special cause, parts regularly fall outside the specification. The project team invests in a more precise tool instead of just inspecting more strictly, and reduces the variation to the point where all parts lie within the limits.

## Frequently asked questions

### Who sets specification limits?

Usually the design function or the customer, based on the functional requirements for the product.

### Why do specification limits not belong on the control chart?

Because they have nothing to do with assessing process behaviour, and they easily lead people to overlook stable but incapable processes or to intervene unnecessarily.

## Related terms

- [Control limit](https://pmdecoder.com/en/glossary/control-limit/)
- [Control chart](https://pmdecoder.com/en/glossary/control-chart/)
- [Requirement](https://pmdecoder.com/en/glossary/requirement/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.