# Special cause

also: Assignable cause

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/special-cause/

## Definition

A special cause is an event that is not part of normal process behaviour: a defective tool, a new batch of material, an operating error or a changed setting. It leads to values outside the control limits or to conspicuous patterns such as trends or shifts. Because it can be identified concretely, it can be investigated and removed in a targeted way, so that the process returns to its stable state.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

Common causes act constantly and produce the normal variation; special causes occur in addition and usually irregularly. Root cause analysis is the approach used to find a special cause. In the literature it is also called an assignable or systematic cause.

## In practice

In a project to improve a painting line, the control chart of coating thickness shows a clear downward shift on a Tuesday. The team asks what changed on that day and finds out that a new batch of paint from a different supplier was used. After returning to the previous batch, the values are back in the usual range. Purchasing adds an incoming inspection for new batches to its procedures.

## Frequently asked questions

### What do you do if a special cause is suspected?

Investigate the process, determine the cause, remove it and check whether it can occur again. Affected results should be assessed separately.

### Can a special cause also be positive?

Yes. An unexpectedly good value can point to an improvement that one wants to understand and use permanently.

## Related terms

- [Common cause](https://pmdecoder.com/en/glossary/common-cause/)
- [Control chart](https://pmdecoder.com/en/glossary/control-chart/)
- [Root cause analysis](https://pmdecoder.com/en/glossary/root-cause-analysis/)
- [Control limit](https://pmdecoder.com/en/glossary/control-limit/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.