# Risk contingency reserve

- Framework: [ISO 21506](https://pmdecoder.com/en/framework/iso-21506/)
- Reference: ISO 21506:2024, 3.79
- Edition: ISO 21506:2024
- Concept: [Allowance for known risks](https://pmdecoder.com/en/concept/allowance-for-known-risks/)
- Topic area: [Risks and opportunities](https://pmdecoder.com/en/area/risks-and-opportunities/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/risk-contingency-reserve/

## Definition

The risk contingency reserve covers the financial or time-related consequences of identified risks that have been accepted or not fully mitigated. Its size is derived from risk analysis, for example from the sum of expected monetary values or from a simulation. It forms part of the budget or schedule but is kept separately so that its use remains visible.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Contingency reserve](https://pmdecoder.com/en/glossary/contingency-reserve/) | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |

## Distinction

The risk contingency reserve applies to identified risks, the management reserve to unforeseeable events; the management reserve is usually controlled not by the project manager but by a higher authority. A flat surcharge unrelated to specific risks is not a risk contingency reserve in the strict sense. Float results from schedule calculation, whereas a schedule buffer is set deliberately.

## In practice

A software project with a budget of 1.2 million euros assesses its twenty most significant risks. The expected monetary values add up to around 90,000 euros, which is planned as a risk contingency reserve. When one of these risks materializes and an interface has to be redeveloped, the project manager draws 35,000 euros and documents the drawdown with reference to the risk. Since then, the status report has shown the remaining reserve alongside the budget.

## Frequently asked questions

### How large should a risk contingency reserve be?

That depends on the risk situation. A figure derived from assessed risks or a simulation is robust; a fixed percentage without justification is not.

### What happens to an unused reserve?

It is released at the end of the project or when the risks no longer apply. It should not be used for new requests.

## Related terms

- [Management reserve](https://pmdecoder.com/en/glossary/management-reserve/)
- [Expected monetary value](https://pmdecoder.com/en/glossary/expected-monetary-value/)
- [Risk acceptance](https://pmdecoder.com/en/glossary/risk-acceptance/)
- [Quantitative risk analysis](https://pmdecoder.com/en/glossary/quantitative-risk-analysis/)
- [Schedule buffer](https://pmdecoder.com/en/glossary/schedule-buffer/)

---