# Risk breakdown structure

- Framework: [ISO 21506](https://pmdecoder.com/en/framework/iso-21506/)
- Reference: ISO 21506:2024, 3.78
- Edition: ISO 21506:2024
- Concept: [Hierarchical breakdown of risk sources](https://pmdecoder.com/en/concept/hierarchical-breakdown-of-risk-sources/)
- Topic area: [Risks and opportunities](https://pmdecoder.com/en/area/risks-and-opportunities/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/risk-breakdown-structure/

## Definition

The risk breakdown structure arranges possible threats and opportunities on several levels, from general sources such as technical, organizational, external and commercial down to specific subcategories such as interfaces, suppliers or permits. It is often maintained as an organization-wide template and adapted for each project or programme. When searching for risks, it helps to go through all areas systematically; in the evaluation, it shows where risks cluster.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Risk breakdown structure](https://pmdecoder.com/en/glossary/risk-breakdown-structure-pmi/) | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |

## Distinction

A risk category is a single node, the risk breakdown structure the entire hierarchy. The work breakdown structure divides up the work, the risk breakdown structure the sources of possible disruptions and improvements. The risk register contains the individual risks, which are classified using the risk breakdown structure.

## In practice

A civil engineering company has developed a risk breakdown structure with four main categories and 26 subcategories from twenty completed projects, including ground conditions, underground utilities, local residents and weather. On a new sewer project, the team goes through each subcategory in the risk workshop. Under underground utilities, it becomes apparent that no up-to-date plans of the telecommunications network are available for one section of road. The risk is recorded and clarified with trial trenches before construction starts.

## Frequently asked questions

### How is a good risk breakdown structure developed?

From an evaluation of the risks that occurred in earlier projects, supplemented by categories from the literature and industry experience; it is reviewed after each project.

### Does every project need its own risk breakdown structure?

No. A shared template makes sense, supplemented with suitable categories for unusual projects.

## Related terms

- [Risk category](https://pmdecoder.com/en/glossary/risk-category/)
- [Risk identification](https://pmdecoder.com/en/glossary/risk-identification/)
- [Risk register](https://pmdecoder.com/en/glossary/risk-register/)
- [Threat](https://pmdecoder.com/en/glossary/threat/)
- [Opportunity](https://pmdecoder.com/en/glossary/opportunity/)
- [Work breakdown structure](https://pmdecoder.com/en/glossary/work-breakdown-structure/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.