## Definition

Rework corrects defects in a result that has already been produced, such as regrinding a component, relaying a faulty cable or revising a document after a review. It causes additional effort and costs that are rarely provided for in the plan, and it often delays subsequent work. If it takes place before handover, it counts as an internal failure cost.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Rework](https://pmdecoder.com/en/glossary/rework-pmi/) | equivalent | — |

## Distinction

As understood in ISO 9000, rework brings a defective result into a state that conforms to the requirements, whereas repair merely makes it usable for its intended use without all requirements being met. A corrective action removes the cause, rework only the individual defect. Scrap is when a result can be neither reworked nor repaired.

## In practice

During the interior fit-out of an office building, the site manager finds that the sockets on two floors are too low because an outdated drawing was used. The rework involves opening the walls, moving the sockets and filling and painting again, eight working days in total. At the same time, the project manager ensures that only approved drawing revisions are available on site, so that the error does not recur.

## Frequently asked questions

### How can rework be reduced?

Through clear requirements, up-to-date documents, early interim checks and the consistent removal of the causes of defects.

### Should rework be taken into account in the schedule?

Experience from earlier projects often justifies a reserve for it. It is important to record rework separately so that its extent becomes visible.

## Related terms

- [Corrective action](https://pmdecoder.com/en/glossary/corrective-action/)
- [Cost of quality](https://pmdecoder.com/en/glossary/cost-of-quality/)
- [Quality control](https://pmdecoder.com/en/glossary/quality-control/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.