# Rework

- Framework: [PMI / PMBOK Guide](https://pmdecoder.com/en/framework/pmi-pmbok/)
- Reference: PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition: PMBOK Guide – Eighth Edition
- Concept: [Correcting a defective result](https://pmdecoder.com/en/concept/correcting-a-defective-result/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Canonical version: https://pmdecoder.com/en/glossary/rework-pmi/

## Definition

In PMI terms, rework is the work needed after the fact to make a defective or nonconforming result conform to requirements or specifications. Rework consumes time and money without creating new value and therefore counts among the costs of nonconformance within the cost of quality. PMI stresses that defects become more expensive the later they are discovered. The aim of quality management is therefore to reduce rework through prevention, early inspection and the removal of causes.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| cross-framework | [Rework](https://pmdecoder.com/en/glossary/rework/) | equivalent | — |

## Distinction

The term corresponds to the cross-framework concept of rework. A corrective action realigns future project performance with the plan; rework fixes a specific defect in a result. A change made because of new requirements is not rework, because the original result met the requirements that applied at the time.

## In practice

At acceptance of a website migration, it turns out that 30 forms do not meet accessibility requirements. The team revises them over two weeks, which had not been planned. A subsequent root cause analysis finds that the requirements had not been built into the form template; the template is updated.

## Frequently asked questions

### Can rework be avoided entirely?

Hardly. The aim is to keep it as low as possible through prevention and early inspection and to learn from rework that does occur.

### Should rework be recorded separately?

Yes, that is advisable. Only when rework effort is visible can quality costs be assessed and improvements justified.

## Related terms

- [Rework](https://pmdecoder.com/en/glossary/rework/)
- [Cost of quality](https://pmdecoder.com/en/glossary/cost-of-quality-pmi/)
- [Corrective action](https://pmdecoder.com/en/glossary/corrective-action-pmi/)
- [Root cause analysis](https://pmdecoder.com/en/glossary/root-cause-analysis-pmi/)
- [Verification](https://pmdecoder.com/en/glossary/verification-pmi/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.