# Quality planning

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Concept: [Setting quality objectives and checks](https://pmdecoder.com/en/concept/setting-quality-objectives-and-checks/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/quality-planning/

## Definition

Quality planning translates requirements into concrete specifications for the project work. It clarifies which standards apply, which quality characteristics are measured, which checks take place when and by whom, which acceptance criteria apply and how deviations are dealt with. The result is often recorded in a quality plan or as part of the project management plan.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Quality management plan](https://pmdecoder.com/en/glossary/quality-management-plan/) | partially overlapping | denotes the document in which the result of quality planning is recorded |
| PRINCE2 | [Quality Management Approach](https://pmdecoder.com/en/glossary/quality-management-approach/) | partially overlapping | Defines standards, procedures and responsibilities; the quality criteria of individual products are in the product descriptions. |
| Six Sigma | [Control plan](https://pmdecoder.com/en/glossary/control-plan/) | partially overlapping | Sets monitoring and reactions for a running process after the project, not quality assurance of the project results. |

## Other terms

- Quality plan (related, not equivalent)

## Classification

- Broader term: [Quality management](https://pmdecoder.com/en/glossary/quality-management/)

## Distinction

Quality planning defines what is to happen, quality assurance checks whether the planned processes are being followed, and quality control checks the results themselves. Inspection planning is a subset of quality planning that is limited to the type, scope and timing of checks.

## In practice

For the development of a medical device, the project team draws up a quality plan at the start. It lists the relevant standards, specifies that every software change goes through a review by a second person and automated tests, sets three formal design reviews and assigns a responsible role to every check. Because the approval authority will later require evidence, the plan also governs which test records are retained and for how long.

## Frequently asked questions

### When does quality planning take place?

Early and in parallel with the rest of the project planning, because checks need time and resources that must be included in the schedule and the budget.

### What belongs in a quality plan?

Quality objectives, applicable standards, inspection and approval steps, responsibilities, tools, documentation requirements and the handling of deviations.

## Related terms

- [Quality assurance](https://pmdecoder.com/en/glossary/quality-assurance/)
- [Acceptance criteria](https://pmdecoder.com/en/glossary/acceptance-criteria/)
- [Design review](https://pmdecoder.com/en/glossary/design-review/)

---