# Project scope

- Framework: [PMI / PMBOK Guide](https://pmdecoder.com/en/framework/pmi-pmbok/)
- Reference: PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition: PMBOK Guide – Eighth Edition
- Concept: [Totality of results and work to be delivered](https://pmdecoder.com/en/concept/totality-of-results-and-work-to-be-delivered/)
- Topic area: [Scope and requirements](https://pmdecoder.com/en/area/scope-and-requirements/)
- Canonical version: https://pmdecoder.com/en/glossary/project-scope-pmi/

## Definition

In PMI usage, project scope is the work a project has to perform so that, at the end, a product, result or service with the agreed features and functions is available. The term refers to the work, not to the characteristics of the result itself. It is recorded in a scope statement and in the work breakdown structure; together with the WBS dictionary these form the approved basis for controlling scope in predictive approaches. In adaptive approaches, by contrast, scope is clarified step by step and reprioritized continuously.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| ISO 21506 | [Project scope](https://pmdecoder.com/en/glossary/project-scope/) | equivalent | — |
| PRINCE2 | [Project Product Description](https://pmdecoder.com/en/glossary/project-product-description/) | partially overlapping | Describes the overall output with quality expectations and acceptance criteria, not the work. |

## Distinction

PMI explicitly separates project scope from product scope, meaning the features and functions of the result. Project scope as defined in ISO 21506 describes the same thing from a cross-framework perspective; project scope in the PMI sense is simply PMI’s term for it. Scope creep denotes the uncontrolled expansion of this scope, while a requirement is a single condition the result has to meet.

## In practice

A software company is to introduce an appointment booking portal for a city administration. The product scope describes what the portal must do, such as online booking and e-mail reminders. The project scope additionally includes migrating data from the legacy system, training the clerical staff and the acceptance tests. Because it is stated explicitly that operation after go-live is not included, a later request for operational support can clearly be handled as a change.

## Frequently asked questions

### What is the difference between project scope and product scope?

Product scope describes the features and functions of the result, project scope the work needed to deliver that result. The two are linked but measured against different yardsticks: the product against its requirements, the project against its plan.

### Why record what is not part of the scope?

Explicit exclusions prevent misunderstandings. Stating in writing which services will not be provided makes it easier to recognize and assess later requests as changes.

## Related terms

- [Project scope](https://pmdecoder.com/en/glossary/project-scope/)
- [Work breakdown structure](https://pmdecoder.com/en/glossary/work-breakdown-structure-pmi/)
- [Requirement](https://pmdecoder.com/en/glossary/requirement-pmi/)
- [Scope creep](https://pmdecoder.com/en/glossary/scope-creep-pmi/)
- [Deliverable](https://pmdecoder.com/en/glossary/deliverable/)

---