# Production levelling

also: Heijunka

- Framework: [Lean](https://pmdecoder.com/en/framework/lean/)
- Canonical version: https://pmdecoder.com/en/glossary/production-levelling/

## Definition

Production levelling, heijunka in Japanese, spreads the workload over a period so that similar volumes and a similar mix of variants are produced every day or shift, instead of working through large batches of one variant after another. This reduces inventories, peak loads and the time individual customers wait for their variant. A common aid is a board with slots for each time interval and variant, into which orders are placed. Levelling is regarded as the foundation on which just-in-time and standardized work can operate stably, and it is the main means against mura.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Classification

- Broader term: [Toyota Production System](https://pmdecoder.com/en/glossary/toyota-production-system/)

## Distinction

Mura is the problem of unevenness, production levelling the countermeasure. Resource levelling in project planning smooths the demand for resources by moving activities; production levelling smooths the sequence and volume of recurring orders. The pull principle responds to demand, and levelling ensures that this demand enters the process evenly.

## In practice

A testing laboratory usually receives large series of samples bundled on Monday and processes them in order. Urgent individual samples therefore often wait for days. The laboratory now schedules a fixed share of series samples and a fixed share of individual samples every day. Utilization becomes more even, and the waiting time for individual samples drops to two days at most.

## Frequently asked questions

### Doesn’t levelling contradict the aim of processing large batches efficiently?

At first sight, yes, because more frequent changeovers cost set-up time. Levelling is therefore often accompanied by shorter set-up times, so that small batches become economical.

### Is production levelling relevant to projects?

Indirectly, for example in organizations with many similar undertakings or requests whose start can be spread more evenly instead of concentrating everything on one deadline.

## Related terms

- [Mura](https://pmdecoder.com/en/glossary/mura/)
- [Just-in-time](https://pmdecoder.com/en/glossary/just-in-time/)
- [Takt time](https://pmdecoder.com/en/glossary/takt-time/)
- [Pull principle](https://pmdecoder.com/en/glossary/pull-principle/)
- [Resource levelling](https://pmdecoder.com/en/glossary/resource-levelling/)

---