# Product Register

- Framework: [PRINCE2](https://pmdecoder.com/en/framework/prince2/)
- Reference: PRINCE2 7, Managementprodukte
- Edition: PRINCE2 7
- Concept: [Managing components and versions of a result](https://pmdecoder.com/en/concept/managing-components-and-versions-of-a-result/)
- Topic area: [Monitoring and control](https://pmdecoder.com/en/area/monitoring-and-control/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/product-register/

## Definition

In PRINCE2 7 the Product Register is the record of the products that a project creates or changes. For each product it holds key details such as identifier, name, version, person responsible and current status, for example in progress, reviewed or accepted. This makes it possible to establish at any time which products exist, which version is valid and what is still outstanding. The register supports the management of product versions and approvals, which earlier editions of PRINCE2 described through Configuration Item Records and Product Status Accounts. Which details are held and who maintains the register is decided by the project during initiation and scaled to its size.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| ISO 21506 | [Configuration management](https://pmdecoder.com/en/glossary/configuration-management/) | partially overlapping | Record of products with version and status on which configuration management relies. |
| PMI / PMBOK Guide | [Configuration management system](https://pmdecoder.com/en/glossary/configuration-management-system/) | partially overlapping | Record of products with version and status on which configuration management relies. |

## Distinction

Configuration management in ISO 21506 or the PMI Configuration Management System refers to the whole procedure; the Product Register is the record on which such a procedure relies within the project. The Quality Register only tracks the quality checks on products, not their versions and overall status. Unlike a Product Backlog in Scrum, it contains no work to be prioritized but the inventory of products.

## In practice

In a project for a new corporate design, project support maintains a Product Register with around 60 entries, including the logo, colour palette, letterhead and presentation template. When the printer uses an older version of the letterhead, the register immediately shows that version 3 is the accepted one and when it was approved. The printer receives the correct file before large quantities are printed.

## Frequently asked questions

### What happened to Configuration Item Records?

PRINCE2 7 brings the details on products together in a Product Register. The earlier distinction between individual configuration records and status accounts for products recedes; the project sets up the details according to its needs.

### Who maintains the Product Register?

The Project Manager is responsible; upkeep is often handled by project support. In organizations with their own configuration management, the register can be linked to their tools.

## Related terms

- [Configuration management](https://pmdecoder.com/en/glossary/configuration-management/)
- [Configuration management system](https://pmdecoder.com/en/glossary/configuration-management-system/)
- [Quality Register](https://pmdecoder.com/en/glossary/quality-register/)
- [Issue Register](https://pmdecoder.com/en/glossary/issue-register-prince2/)
- [Formal acceptance](https://pmdecoder.com/en/glossary/formal-acceptance/)
- [Product Description](https://pmdecoder.com/en/glossary/product-description/)
- [Product Breakdown Structure](https://pmdecoder.com/en/glossary/product-breakdown-structure-prince2/)
- [Issues practice](https://pmdecoder.com/en/glossary/issues-practice/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
