# Poka-yoke

- Framework: [Lean](https://pmdecoder.com/en/framework/lean/)
- Canonical version: https://pmdecoder.com/en/glossary/poka-yoke/

## Definition

Poka-yoke roughly means avoiding inadvertent mistakes. Instead of relying on attention and inspection, the work step is designed so that an error is either impossible or noticed at the very moment it occurs. A distinction is made between solutions that prevent a wrong action, such as a plug that only fits one way round, and solutions that warn, such as a signal when a part is missing. The approach was shaped by Shigeo Shingo in the context of the Toyota Production System. Poka-yoke solutions are usually simple and inexpensive and work without training.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

An inspection detects errors after they have occurred; poka-yoke prevents them at the source. Autonomation stops a process when an error occurs, and poka-yoke is often the technical means that detects the error for this purpose. FMEA assesses possible failures systematically and names countermeasures; poka-yoke is one of the most effective types of countermeasure that can result from it.

## In practice

In a funding programme, applicants keep submitting incomplete documents, and every query costs weeks. The project team redesigns the online form: mandatory fields cannot be skipped, dates are checked for plausibility, and the application can only be submitted once all attachments have been uploaded. The share of incomplete applications drops from a third to a few isolated cases.

## Frequently asked questions

### Is poka-yoke only intended for engineering?

No. The principle can be transferred to forms, software, checklists and office processes, wherever recurring errors can be ruled out by design.

### Does poka-yoke replace quality inspection?

Partly. For the error types that are safeguarded, a later inspection becomes unnecessary. For other errors it remains necessary until they, too, are prevented at the source.

## Related terms

- [Autonomation](https://pmdecoder.com/en/glossary/autonomation/)
- [Muda](https://pmdecoder.com/en/glossary/muda/)
- [FMEA](https://pmdecoder.com/en/glossary/fmea/)
- [Quality assurance](https://pmdecoder.com/en/glossary/quality-assurance/)
- [Rework](https://pmdecoder.com/en/glossary/rework/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
