# Network planning technique

also: Network analysis

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Network planning](https://pmdecoder.com/en/area/network-planning/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/network-planning-technique/

## Definition

The network planning technique represents the flow of a project as a network of nodes and arrows and uses it to calculate dates, float and the critical path. It comprises several methods that differ in how they represent the network: activities can appear as nodes or as arrows, and some methods focus on events rather than activities. In Germany, the standard DIN 69900 describes the related terms and drawing rules.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

The network planning technique is the method; the network schedule is its result. The critical path method and PERT are individual methods within the network planning technique, both developed in the United States in the late 1950s. The Gantt chart is a means of presentation that shows dates clearly but brings no calculation logic of its own.

## In practice

A plant manufacturer plans the installation of a bottling line with around 400 activities. Without the network planning technique it would be almost impossible to see which tasks determine the end date. From durations and dependencies, the scheduling software calculates that the critical path runs through the pipework and the pressure test. The installation management focuses its attention on these 35 activities and deliberately gives the other trades room to manoeuvre.

## Frequently asked questions

### Do small projects need the network planning technique as well?

Thinking in dependencies always helps. A formal calculation usually only pays off once there are a few dozen activities with many links between them.

### Which methods belong to the network planning technique?

Above all the critical path method, PERT with its probability-based estimates and the Metra Potential Method with activities as nodes, plus newer approaches such as the critical chain method.

## Related terms

- [Network schedule](https://pmdecoder.com/en/glossary/network-schedule/)
- [Critical path method](https://pmdecoder.com/en/glossary/critical-path-method/)
- [Critical path](https://pmdecoder.com/en/glossary/critical-path/)
- [Gantt chart](https://pmdecoder.com/en/glossary/gantt-chart/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.