# Muri

- Framework: [Lean](https://pmdecoder.com/en/framework/lean/)
- Canonical version: https://pmdecoder.com/en/glossary/muri/

## Definition

Muri describes excessive demands, for example when people lift too heavily, work too fast, have to handle too many tasks at once or work without adequate instruction, or when machines are operated beyond their design limits. Overburden leads to errors, breakdowns, accidents and exhaustion. In the Toyota Production System, muri together with muda and mura forms the three types of loss. Countermeasures are even workloads, clear standards, good workplace design and limits on work in progress.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

Muda is effort without value, muri an excess of strain, mura uneven load. Mura often leads to muri: peaks in workload overburden for a time, troughs leave capacity unused. Resource levelling in project planning moves activities in order to avoid overload and thus works directly against muri.

## In practice

A project manager looks after five projects at the same time because each is considered urgent. She regularly works at weekends, decisions are left pending and errors in reports accumulate. In the portfolio board, the overload is named as muri. The board sets a ceiling of two projects per project manager and puts two undertakings on hold until capacity becomes free.

## Frequently asked questions

### Why is overburden regarded as a loss in Lean thinking?

Because in the long run it costs performance: overburdened people and equipment make more errors and fail more often. The consequences show up later as waste in the form of rework and waiting times.

### How can muri be recognized in knowledge work?

By many tasks started at the same time, constant overtime, growing backlogs and rising error counts. Metrics on work in progress and lead times make it visible.

## Related terms

- [Muda](https://pmdecoder.com/en/glossary/muda/)
- [Mura](https://pmdecoder.com/en/glossary/mura/)
- [Production levelling](https://pmdecoder.com/en/glossary/production-levelling/)
- [Work in Progress](https://pmdecoder.com/en/glossary/work-in-progress/)
- [Resource levelling](https://pmdecoder.com/en/glossary/resource-levelling/)

---