# Minimum viable product

- Framework: [PMI / PMBOK Guide](https://pmdecoder.com/en/framework/pmi-pmbok/)
- Reference: PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition: PMBOK Guide – Eighth Edition
- Concept: [Simplest product version for learning](https://pmdecoder.com/en/concept/simplest-product-version-for-learning/)
- Topic area: [Approaches and agility](https://pmdecoder.com/en/area/approaches-and-agility/)
- Canonical version: https://pmdecoder.com/en/glossary/minimum-viable-product-pmi/

## Definition

In PMI’s understanding a minimum viable product, abbreviated MVP, is a concept for deciding what a solution's first release should contain: only as many features are built as are needed for the solution to be genuinely usable for its users and to generate feedback. The purpose is twofold. Customers receive value early, and the team learns with little effort whether its basic assumptions about need and solution are correct. On the basis of these insights a decision is taken on how the product will be developed further, whether the course will change or whether the undertaking will end. The MVP is thus a means of reducing risk early in uncertain undertakings.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| cross-framework | [Minimum viable product](https://pmdecoder.com/en/glossary/minimum-viable-product/) | equivalent | — |

## Distinction

The cross-framework term minimum viable product refers to the same thing. A prototype often only serves to try out an idea and need not be fit for use; an MVP is used by real users. The MVP differs from the first increment of an iteration in that it is based on the smallest worthwhile scope for a release to the market or to users.

## In practice

A municipal utility is considering an app for charging electric cars. Instead of developing reservations, billing and route planning at the same time, the team first releases a version that shows available charging points and lets users start a charging session. After eight weeks the usage data show that the availability display is in particular demand; reservations are postponed.

## Frequently asked questions

### How small may an MVP be?

As small as possible, but not smaller than needed for real value. A solution that nobody can use sensibly provides no useful feedback.

### Is an MVP only suitable for software products?

No. Services, processes or physical products can also be tried out in a first lean version, for example as a pilot offer for a small group of customers.

## Related terms

- [Minimum viable product](https://pmdecoder.com/en/glossary/minimum-viable-product/)
- [Design thinking](https://pmdecoder.com/en/glossary/design-thinking-pmi/)
- [Adaptive approach](https://pmdecoder.com/en/glossary/adaptive-approach/)
- [User story](https://pmdecoder.com/en/glossary/user-story-pmi/)
- [Roadmap](https://pmdecoder.com/en/glossary/roadmap-pmi/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.