# Measurement system analysis

abbr. MSA

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/measurement-system-analysis/

## Definition

Every measurement varies, and this variation is superimposed on the variation of the process being measured. Measurement system analysis determines how large the share of the measurement system is and whether it is acceptable in relation to the tolerance or the process variation. Aspects examined include bias, repeatability, i.e. the variation when the same person measures the same part several times, and reproducibility, i.e. the differences between different appraisers. Linearity across the measuring range and stability over time are added. For pass/fail inspections there are separate methods that assess the agreement of the decisions.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Other terms

- MSA (abbreviation)
- Gage R&R (related, not equivalent): repeatability and reproducibility study as part of measurement system analysis

## Distinction

Calibration compares an instrument with a reference standard and establishes its deviation, while measurement system analysis assesses the entire measurement system in practical use, including people and environment. It is a prerequisite for control charts and process capability studies, because their results are only as good as the measurements. The study of repeatability and reproducibility is a core element, but not the whole of measurement system analysis.

## In practice

In a project to relocate an assembly line, the new plant reports considerably more rejects in the gap inspection than the old one. Before the equipment is changed, the project manager has a measurement system analysis carried out: three appraisers measure ten parts three times each. It turns out that the readings depend strongly on who is measuring, because the gauge is applied in different ways. A fixture that defines the position of the gauge and a short training session reduce the measurement variation considerably; most of the apparent rejects disappear.

## Frequently asked questions

### When should a measurement system analysis be carried out?

Before measurement data are used for important decisions, for example with new inspection equipment, at process start-up, after changes to the measurement method and whenever results seem implausible.

### How large may the share of measurement variation be?

This is set by customers, industry guidelines or internal rules. A widespread rule of thumb says that a share below ten per cent of the tolerance is good and above thirty per cent is no longer acceptable.

## Related terms

- [Process capability](https://pmdecoder.com/en/glossary/process-capability/)
- [Statistical process control](https://pmdecoder.com/en/glossary/statistical-process-control/)
- [Control chart](https://pmdecoder.com/en/glossary/control-chart/)
- [Specification limit](https://pmdecoder.com/en/glossary/specification-limit/)
- [Quality control](https://pmdecoder.com/en/glossary/quality-control/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
