# Lean Six Sigma

abbr. LSS

- Framework: [Six Sigma](https://pmdecoder.com/en/framework/six-sigma/)
- Canonical version: https://pmdecoder.com/en/glossary/lean-six-sigma/

## Definition

Lean Six Sigma combines two improvement approaches that come from different directions. Lean aims to eliminate waste and speed up the flow of work, for example through shorter waiting times, less inventory and fewer handovers. Six Sigma aims to reduce variation and defects with data and statistical methods. In Lean Six Sigma both toolkits are used together, usually embedded in the DMAIC approach: value stream mapping, standardized work or pull principles sit alongside measurement system analysis, control charts and design of experiments. The belt roles are often adopted as well, with Lean content added to the training. Which tools a project uses depends on the problem.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

Pure Six Sigma can leave behind a process with few defects that is still slow; pure Lean can create a fast process whose variation remains uncontrolled. Lean Six Sigma aims to cover both. It differs from Total Quality Management in being organized as clearly defined projects with fixed roles. There is no separate standardized body of rules; content and training differ between providers.

## In practice

A hospital laboratory uses Lean Six Sigma to shorten the time to a test result. A value stream map shows that samples spend most of their time waiting; the team introduces smaller, more frequent transports. At the same time the data analysis reveals that some samples have to be repeated because of incorrect labels, and a revised labelling procedure lowers this error rate.

## Frequently asked questions

### Is Lean Six Sigma a framework of its own?

It is more a combination of two approaches than an independent body of rules. The glossary therefore lists the term under Six Sigma, with links to the Lean terms.

### When is the emphasis on Lean, and when on Six Sigma?

Where waiting times, handovers and unnecessary steps dominate, Lean tools help most. Where results fluctuate and defects are hard to explain, the statistical methods of Six Sigma are needed.

## Related terms

- [DMAIC](https://pmdecoder.com/en/glossary/dmaic/)
- [Kaizen](https://pmdecoder.com/en/glossary/kaizen/)
- [Total quality management](https://pmdecoder.com/en/glossary/total-quality-management/)
- [Theory of Constraints](https://pmdecoder.com/en/glossary/theory-of-constraints/)
- [Black Belt](https://pmdecoder.com/en/glossary/black-belt/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
