# Lag

also: Lag time

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Concept: [Waiting time between predecessor and successor](https://pmdecoder.com/en/concept/waiting-time-between-predecessor-and-successor/)
- Topic area: [Network planning](https://pmdecoder.com/en/area/network-planning/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/lag/

## Definition

A lag delays the start or finish of a successor relative to the linked point in time of the predecessor. With a finish-to-start relationship and a lag of three days, the successor starts three days after the predecessor has finished at the earliest. A lag represents periods in which no work is done but waiting is still necessary, for example for drying, curing, delivery periods or statutory objection periods.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Lag](https://pmdecoder.com/en/glossary/lag-pmi/) | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |

## Distinction

The lead is its counterpart and allows an overlap. A lag is not an activity; it consumes no resources and is therefore entered on the link. If the waiting time is to be visibly monitored or someone is to be responsible for it, for example an inspection by a public authority, a separate activity is often the better choice.

## In practice

On a construction site, a cement screed must dry sufficiently before parquet flooring is laid. The site manager links "Pour screed" and "Lay parquet" with a finish-to-start relationship and a lag of 28 calendar days. Because drying continues at weekends, she deliberately counts in calendar days rather than working days. Before the parquet is laid, the residual moisture is also measured.

## Frequently asked questions

### Why are lags often counted in calendar days?

Because many waiting periods, such as drying or deadlines, run regardless of working days. Most scheduling tools allow both.

### Is a lag the same as float?

No. A lag must be observed, whereas float is room to manoeuvre that may be used up.

## Related terms

- [Lead](https://pmdecoder.com/en/glossary/lead/)
- [Logical relationship](https://pmdecoder.com/en/glossary/logical-relationship/)
- [Float](https://pmdecoder.com/en/glossary/float/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
