# Lag

- Framework: [PMI / PMBOK Guide](https://pmdecoder.com/en/framework/pmi-pmbok/)
- Reference: PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition: PMBOK Guide – Eighth Edition
- Concept: [Waiting time between predecessor and successor](https://pmdecoder.com/en/concept/waiting-time-between-predecessor-and-successor/)
- Topic area: [Network planning](https://pmdecoder.com/en/area/network-planning/)
- Canonical version: https://pmdecoder.com/en/glossary/lag-pmi/

## Definition

A lag is a waiting time attached to a logical relationship between two activities. It specifies that the successor cannot start or finish immediately but only after a certain time has elapsed. Typical reasons are technical waiting times such as curing or drying, delivery times or prescribed periods. A lag consumes no resources and creates no work. It can be applied to any of the four relationship types and is taken into account in the forward and backward pass.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| cross-framework | [Lag](https://pmdecoder.com/en/glossary/lag/) | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |

## Distinction

Lag corresponds to the German Nachlaufzeit, also known as a positive time offset. Its counterpart is lead, which brings the successor forward. A waiting time that involves work or cost, such as an inspection by a public authority, can also be planned as a separate activity; this makes it more visible in the plan than a lag.

## In practice

After a concrete slab is poured, two weeks must pass before the formwork may be removed. The site manager links “pour slab” and “strip formwork” with finish-to-start and a lag of 14 days. If pouring is postponed, the stripping date moves with it automatically and the waiting time is not forgotten.

## Frequently asked questions

### Should a lag be expressed in working days or calendar days?

That depends on the reason. Drying time continues over the weekend, whereas a processing period at an authority usually counts only working days. Many tools allow both; what matters is choosing deliberately.

### Why are many lags seen as a planning weakness?

Because they can hide reasons. A lag without a recognizable explanation makes the plan hard to follow. Anyone using lags should document their purpose.

## Related terms

- [Lag](https://pmdecoder.com/en/glossary/lag/)
- [Lead](https://pmdecoder.com/en/glossary/lead-pmi/)
- [Logical relationship](https://pmdecoder.com/en/glossary/logical-relationship-pmi/)
- [Finish-to-start](https://pmdecoder.com/en/glossary/finish-to-start/)
- [Forward pass](https://pmdecoder.com/en/glossary/forward-pass-pmi/)

---