# Kanban system

- Framework: [Kanban](https://pmdecoder.com/en/framework/kanban/)
- Reference: Kanban Guide 2025.5, Abschnitt Definition of Kanban
- Edition: The Kanban Guide, May 2025
- Canonical version: https://pmdecoder.com/en/glossary/kanban-system/

## Definition

According to the Kanban Guide, a Kanban system is the concrete application of the three Kanban practices: defining and visualizing the workflow, actively managing the work within it, and improving the workflow. The Guide understands Kanban as a strategy that seeks to improve how value flows through a process, and it uses Kanban and Kanban system as collective terms for all the concepts it describes, with reference to knowledge work. A Kanban system does not consist of fixed roles or meetings but of the shared Definition of Workflow, the work items, the limiting of work in progress, explicit policies, a Service Level Expectation and the four flow metrics. It can be used in almost any workflow and at any scale.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Classification

- Narrower terms: [Flow metrics](https://pmdecoder.com/en/glossary/flow-metrics/), [Kanban practices](https://pmdecoder.com/en/glossary/kanban-practices/), [Kanban system member](https://pmdecoder.com/en/glossary/kanban-system-member/)

## Distinction

A Kanban board is only the visualization of a Kanban system. In manufacturing, Kanban system originally refers to controlling the replenishment of materials with cards, as known from the Toyota Production System. With its Kanban Method, Kanban University describes a broader approach with principles and additional practices.

## In practice

A legal department reviews contracts for the sales team. It specifies that a review starts when the complete draft contract is received and ends with its approval, maps the states in between on a board, allows no more than six reviews at the same time and measures how long contracts take. After two months, the data shows that queries back to sales take up most of the time; the department introduces a checklist for submitted drafts.

## Frequently asked questions

### Does a Kanban system need special roles?

No. The Kanban Guide does not prescribe any roles. It speaks of members of the Kanban system, meaning everyone involved in delivering value.

### Can a Scrum Team use a Kanban system?

Yes. The Kanban Guide envisages combining Kanban with other value-oriented approaches. There is also a separate Kanban Guide for Scrum Teams.

## Related terms

- [Flow](https://pmdecoder.com/en/glossary/flow/)
- [Kanban board](https://pmdecoder.com/en/glossary/kanban-board/)
- [Scrum Guide](https://pmdecoder.com/en/glossary/scrum-guide/)
- [Theory of Constraints](https://pmdecoder.com/en/glossary/theory-of-constraints/)

## Differences from other editions

- The Kanban Guide, December 2020: The definition of Kanban explicitly referred to a visual system based on pull, and the guide called its practices and measures immutable: anyone who adopted only some of them was, in the guide’s view, not doing Kanban. Neither statement appears in the 2025 version.

---