# Kanban practices

- Framework: [Kanban](https://pmdecoder.com/en/framework/kanban/)
- Reference: Kanban Guide 2025.5, Abschnitt Kanban Practices
- Edition: The Kanban Guide, May 2025
- Canonical version: https://pmdecoder.com/en/glossary/kanban-practices/

## Definition

The Kanban Guide describes Kanban through three practices that work together. First, the members define what flow means in their environment, record this in the Definition of Workflow and make it visible, usually on a Kanban board. Second, they actively manage the work in the workflow: they limit work in progress, make sure that work items do not sit idle for longer than necessary and resolve blockers. Third, they continuously improve the workflow so that effectiveness, efficiency and predictability are better balanced, supported by the flow metrics. Together, the practices as applied form a Kanban system. Other methods may be added as long as the minimum practices are retained.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Classification

- Broader term: [Kanban system](https://pmdecoder.com/en/glossary/kanban-system/)
- Narrower terms: [Blocked work](https://pmdecoder.com/en/glossary/blocked-work/), [Definition of Workflow](https://pmdecoder.com/en/glossary/definition-of-workflow/), [Kanban board](https://pmdecoder.com/en/glossary/kanban-board/), [Pull system](https://pmdecoder.com/en/glossary/pull-system/)

## Distinction

In its Kanban Method, Kanban University describes six general practices and additional principles; the Kanban Guide deliberately limits itself to three. Unlike the events in Scrum, the practices do not set fixed meetings: reviews may take place continuously or at intervals.

## In practice

A marketing team introduces Kanban in three steps. It first describes what counts as a campaign element, when an element starts and ends and which states lie in between, and maps this on a board. It then limits the elements in design to five and discusses every morning which pieces of work are stuck. After six weeks, it evaluates how long elements take and removes a duplicate approval loop.

## Frequently asked questions

### In what order are the practices introduced?

The Kanban Guide does not prescribe an order. The three practices work together; what matters is that all of them are applied.

### Are meetings part of the Kanban practices?

Not as a requirement. Many teams review their work regularly, but the Kanban Guide leaves open whether this happens continuously, at fixed intervals or both.

## Related terms

- [Definition of Workflow](https://pmdecoder.com/en/glossary/definition-of-workflow/)
- [Flow metrics](https://pmdecoder.com/en/glossary/flow-metrics/)
- [Scrum Event](https://pmdecoder.com/en/glossary/scrum-event/)

## Differences from other editions

- The Kanban Guide, December 2020: Practices and measures were considered immutable; in the guide’s view, adopting only some of them did not amount to Kanban. Active management explicitly also included preventing work items from accumulating in individual sections of the workflow.

---